
Instant Price Estimation
We leverage a custom AI model, historical data, local rates, known challenges, and extensive experience to provide quality price range estimations in 1~3 minutes (perfect for rough budgeting).
These quick estimations are based entirely on the info you provide to our AI model and can be highly precise (±10~15%) when sufficient project details are supplied!
For a rapid ballpark price estimate, please use our Heavy Lifting & Moving Calculator 👈
Minimum Prices
We offer competitive market prices for our specialized professional services.
To balance quality, availability, profitability, and client satisfaction, we maintain the following minimum prices (per project):
- United States: 2,000~2,500 USD
- Canada: 2,500~3,000 CAD
- United Kingdom: 1,000~1,500 GBP
- Australia: 2,500~3,000 AUD
- New Zealand: 2,500~3,000 NZD
- Ireland: 1,500~2,000 EUR
- Singapore: 2,000~2,500 SGD
These minimum prices ensure we deliver the highest quality service with our experienced teams and specialized equipment!
Typical Price Ranges
- Industrial Rigging and Lifting: 3,000~5,500 USD per project
- Machinery and Equipment Moving: 3,500~7,500 USD per project
- Millwrighting and Installation Services: 4,500~8,500 USD per project
- Forklift Moving Services: 2,500~3,500 USD per project
- Crating and Packing Services: 2,500~3,200 USD per project
- Industrial Storage and Warehousing: 900~1,800 USD per month
- Plant and Factory Relocation: 12,000~28,000 USD per project
- Specialized Equipment Installation: 3,500~6,500 USD per project
- Equipment Disassembly and Reassembly: 3,000~4,500 USD per project
- Equipment Alignment and Leveling: 3,000~3,500 USD per project
Most of our projects range from 3,000 to 45,000 USD (or equivalent in other currencies).
Costs depend on complexity, location, equipment/load type, size, weight, distance, insurance, etc.
Prices can exceed 200,000 USD for comprehensive plant, factory, production line, or machine room relocations!
To get a more precise quotation for your specific case, please accurately Fill Out This Form 👈
Our local estimators usually respond in 2~4 business hours or sooner.
NOTE: We broker all trucking services and do not own any trucks or trailers!
Key Cost Factors

When it comes to pricing, we prefer Complete Transparency & CuStOmizAtion
Projects are Unique, and so should your pricing plan 💰
We personalize every quote with No Hidden Costs or surprises
Here is how we usually break down the total cost into its factors…👇
Cost Factor | Description |
---|---|
Geographical Considerations | Your site’s location impacts the logistical challenges, affecting the overall cost. This includes accessibility, local laws, and transportation options. |
Unique Requirements | Every project has different service needs, such as the types of machinery to be moved, rigging necessities, or any specialized handling that may be required. |
Item Size, Weight, and Complexity | The physical dimensions, weight, and complexity of your machinery, equipment, or any other load directly affect the workforce and equipment needed for the job. |
Route Specifics | The route’s horizontal and vertical layout impacts the project’s complexity. Obstacles, corners, and floors traversed are all considered. |
Transportation Elements | The distance between the pickup and drop-off locations and any required permits or special permissions are accounted for in the pricing. |
Workforce & Specialized Equipment | The number of team members and the specific types of equipment required are determined by the project’s scope, affecting the total cost. |
Time Sensitivity | If your project is time-sensitive, additional resources may be allocated to meet your deadline, which could incur expedited service fees. |
Volume Discounts | More extensive projects benefit from economies of scale. When you book a large-scale operation, special rates pass you down cost efficiencies. |
Insurance Options | We offer different insurance packages that cover various levels of risk, from basic coverage to comprehensive plans that provide added security. |
What We Need from You

To significantly speed up the estimation process, please provide us with…
- Related Photos & Videos (if any) 📸
- Specs, Schemas, Tech Details (if any) 📄
- Vital Description of Your Case 🧭
Your Next Best Action

The Easiest Way is to submit your quote request 24/7 via >> Get a Quote <<
Our local estimators usually respond in 2~4 working hours.
If you have no idea how much your job could cost, it is possible to roughly estimate it using our FREE smart tool to Calculate Your Ballpark Price Range 👈
Important to Know…
- We process many incoming requests & phone calls in multiple countries 24/7
- We use AI to assist our human estimators in preparing high-quality quotations
- Describe your requirements As Detailed As Possible so we have less ambiguity 🤪
What You Get from Us

You will get The Final Price explicitly tailored to your case.
If required, our estimator will visit your site FREE of charge to refine the final price.
Note: Usually, if we have photos/videos and enough tech details from you, a high-quality estimation can be prepared remotely w/o any visit to your site!
Average Price Ranges

The price ranges below are Rough Estimates and may vary based on your requirements ☝️
Refer to this info ONLY to gain a General Understanding of how much it could cost you 🧐
Please >> Get in Touch with Us << for a more accurate quote tailored to your case 🎯
Price Ranges in the US 🇺🇸
Type of Service | Price Range | Details |
---|---|---|
Heavy Industrial/Commercial Equipment and Machinery Moving | USD 200 ~ USD 400 per Hour | Cost per hour of moving heavy machinery and equipment. Includes labor and specialized moving equipment. Minimum = 2 hours Usually = 2~6 hours |
Machinery Relocation and Transportation | USD 1,500 ~ USD 10,000+ | Pricing depends on the complexity of the relocation. Includes specialized equipment and skilled labor. Minimum = USD 500 Usually = 1~2 days |
Industrial/Heavy Rigging and Lifting | USD 1,500 ~ USD 10,000+ | Cost is dependent on the scope and complexity of the rigging and lifting job. Includes skilled labor and machinery. Minimum = USD 500 Usually = 1~3 days |
Heavy Erecting Services | USD 2,000 ~ USD 12,000+ | Cost is based on the scope and complexity of the erecting project. Includes skilled labor and machinery. Minimum = USD 500 Usually = 2~4 days |
Lab and Medical Equipment Moving | USD 1,500 ~ USD 7,000+ | Includes sensitive handling, specialized packing, and transport. Minimum = USD 500 Usually = 1 day |
CNC Machine Moving Services | USD 2,000 ~ USD 10,000+ | Cost is based on the type and size of the CNC machine and distance. Minimum = USD 500 Usually = 1~3 days |
Printing Equipment Moving Services | USD 1,500 ~ USD 8,000+ | Includes disassembly, moving, and reassembly of printing equipment. Minimum = USD 500 Usually = 1~2 days |
Electrical Transformers Moving | USD 2,000 ~ USD 10,000+ | Cost is based on the size and complexity of the transformer, as well as distance. Minimum = USD 500 Usually = 1~3 days |
IT/Data Centers Moving Services | USD 5,000 ~ USD 30,000+ | Includes safe shutdown, transport, and setup of IT equipment. Price can vary based on volume and complexity. Minimum = USD 1000 Usually = 1~4 days |
Factory/Plant Relocation Services | USD 50,000 ~ USD 200,000+ | Comprehensive service for relocating factories and plants. Includes planning, labor, and logistics. Minimum = USD 2000 Usually = 1~2 weeks |
Industrial Millwright and Installation | USD 200 ~ USD 300 per Hour | Cost per hour for installing or maintaining industrial machinery. Includes skilled millwright labor. Minimum = 2 hours Usually = 2~8 hours |
Industrial Storage and Warehousing | USD 0.50 ~ USD 2.50+ per Sq Ft / Month | Monthly fee per square foot for storage of industrial equipment and machinery. Minimum = 50-100 sq ft for 1-3 months storing commitment |
Crating and Packing Services | Starting at USD 50 per Crate | Cost per crate for packing services. Size and material can affect the price. Minimum = 2 crates Usually = 1 day |
Forklift Moving Service | USD 100 ~ USD 200 per Hour | The price per hour for forklift operation includes operator and fuel. Minimum = 2 hours Usually = 2~5 hours |
Crane Rental with Operator | USD 200 ~ USD 400 per Hour | The cost per hour includes both the crane rental and the skilled operator. Rates can vary depending on the type of crane required and the project’s complexity. Minimum = 4 hours Usually = 4~10 hours |
Project Management and Consultation | USD 100 ~ USD 200 per Hour | Price per hour for overseeing and consulting on industrial moving projects. Minimum = 2 hours Usually = 2~8 hours |
Logistics Services | Approximately 5~15% of Total Project Cost | Logistics services cover everything from planning and coordination to monitoring and executing the move. This fee is in addition to the costs of other services and ensures a smooth, hassle-free experience. Separate charge, not included in other service quotes! |
Clean Room Moving Services | USD 2,000 ~ USD 12,000+ | Specialized service for moving equipment in and out of clean rooms. Includes necessary precautions and labor. Minimum = USD 500 Usually = 1~3 days |
High-Value Equipment Insurance | Customized Pricing | The cost of insuring your high-value equipment is customized based on its market value, transportation risks, and the nature of your project. |
Emergency Response Services | USD 300 ~ USD 600 per Hour | Premium rates for emergency response services include after-hours availability and rapid deployment of specialized labor and machinery. Minimum = USD 1000 Usually = 1~4 hours |
Decommissioning Services | USD 1,500 ~ USD 10,000+ | Includes safe disassembly and removal of industrial machinery and equipment. Minimum = USD 500 Usually = 1~2 days |
Overseas Shipping Services | USD 5,000 ~ USD 50,000+ | Includes international shipping, customs clearance, and logistics. Minimum = USD 1000 Usually = 1~2 weeks |
Transport Route Planning | USD 500 ~ USD 2,000 per Project | One-time fee for planning the most efficient and safe transport routes. Minimum = USD 500 Usually = 1~3 days |
Preventative Maintenance and Inspection | USD 150 ~ USD 400 per Hour | Cost per hour for preventive checks and maintenance of industrial machinery. Minimum = 2 hours Usually = 2~6 hours |
Waste Management and Recycling | USD 500 ~ USD 2,000 per Project | Includes disposal and/or recycling of industrial waste. Minimum = USD 500 Usually = 1~2 days |
Price Ranges in Canada 🇨🇦
Type of Service | Price Range | Details |
---|---|---|
Heavy Industrial/Commercial Equipment & Machinery Moving | CAD 270 ~ CAD 540 per Hour | Cost per hour of moving heavy machinery and equipment. Includes labor and specialized moving equipment. Minimum = 3 hours Usually = 2~6 hours |
Machinery Relocation and Transportation | CAD 2,000 ~ CAD 13,500+ | Pricing varies based on the complexity of the relocation, specialized equipment, and skilled labor required. Minimum = CAD 700 Usually = 1~2 days |
Industrial/Heavy Rigging and Lifting | CAD 2,000 ~ CAD 13,500+ | The scope and complexity of the rigging and lifting job, skilled labor, and machinery determine cost. Minimum = CAD 700 Usually = 1~3 days |
Heavy Erecting Services | CAD 2,700 ~ CAD 16,200+ | Cost is based on the scope and complexity of the project, inclusive of skilled labor and machinery. Minimum = CAD 700 Usually = 2~4 days |
Lab and Medical Equipment Moving | CAD 2,000 ~ CAD 9,450+ | Includes sensitive handling, specialized packing, and transport. Minimum = CAD 700 Usually = 1 day |
CNC Machine Moving Services | CAD 2,700 ~ CAD 13,500+ | Pricing is based on the type and size of the CNC machine and distance. Minimum = CAD 700 Usually = 1~3 days |
Printing Equipment Moving Services | CAD 2,000 ~ CAD 10,800+ | Cost includes disassembly, moving, and reassembly of printing equipment. Minimum = CAD 700 Usually = 1~2 days |
Electrical Transformers Moving | CAD 2,700 ~ CAD 13,500+ | Cost is based on the size and complexity of the transformer and distance. Minimum = CAD 700 Usually = 1~3 days |
IT/Data Centers Moving Services | CAD 6,750 ~ CAD 40,500+ | Includes safe shutdown, transport, and setup of IT equipment. Prices can vary based on volume and complexity. Minimum = CAD 1,350 Usually = 1~4 days |
Factory/Plant Relocation Services | CAD 67,500 ~ CAD 270,000+ | Comprehensive service for relocating factories and plants. Includes planning, labor, and logistics. Minimum = CAD 2,700 Usually = 1~2 weeks |
Industrial Millwright and Installation | CAD 270 ~ CAD 405 per Hour | Cost per hour for installing or maintaining industrial machinery. Includes skilled millwright labor. Minimum = 3 hours Usually = 2~8 hours |
Industrial Storage and Warehousing | CAD 0.65 ~ CAD 3.40 per Sq Ft/Month | Monthly fee per square foot for storage of industrial equipment and machinery. Minimum = 50-150 sq ft for 1-3 months storing commitment |
Crating and Packing Services | Starting at CAD 65 per Crate | Cost per crate for packing services. Size and material can affect the price. Minimum = 3 crates Usually = 1 day |
Forklift Moving Service | CAD 135 ~ CAD 270 per Hour | The price per hour for forklift operation includes operator and fuel. Minimum = 3 hours Usually = 2~5 hours |
Crane Rental with Operator | CAD 270 ~ CAD 540 per Hour | Cost per hour includes both the crane rental and skilled operator. Rates may vary based on the type of crane and project complexity. Minimum = 5 hours Usually = 4~10 hours |
Project Management and Consultation | CAD 135 ~ CAD 270 per Hour | Price per hour for overseeing and consulting on industrial moving projects. Minimum = 3 hours Usually = 2~8 hours |
Logistics Services | 6~17% of Total Project Cost | It covers planning, coordination, monitoring, and execution. Separate charge, not included in other service quotes! |
Clean Room Moving Services | CAD 2,700 ~ CAD 16,200+ | Specialized service for moving equipment in and out of clean rooms. Includes necessary precautions and labor. Minimum = CAD 700 Usually = 1~3 days |
High-Value Equipment Insurance | Customized Pricing | The cost of insuring high-value equipment is customized based on its market value, transportation risks, and project nature. |
Emergency Response Services | CAD 405 ~ CAD 810 per Hour | Premium rates include after-hours availability and rapid deployment of specialized labor and machinery. Minimum = CAD 1,350 Usually = 1~4 hours |
Decommissioning Services | CAD 2,000 ~ CAD 13,500+ | Includes safe disassembly and removal of industrial machinery and equipment. Minimum = CAD 700 Usually = 1~2 days |
Overseas Shipping Services | CAD 6,750 ~ CAD 67,500+ | Includes international shipping, customs clearance, and logistics. Minimum = CAD 1,350 Usually = 1~2 weeks |
Transport Route Planning | CAD 675 ~ CAD 2,700 per Project | One-time fee for planning the most efficient and safe transport routes. Minimum = CAD 700 Usually = 1~3 days |
Preventative Maintenance and Inspection | CAD 200 ~ CAD 540 per Hour | Cost per hour for preventive checks and maintenance of industrial machinery. Minimum = 3 hours Usually = 2~6 hours |
Waste Management and Recycling | CAD 675 ~ CAD 2,700 per Project | Includes disposal and/or recycling of industrial waste. Minimum = CAD 700 Usually = 1~2 days |
Price Ranges in the UK 🇬🇧
Type of Service | Price Range | Details |
---|---|---|
Heavy Industrial/Commercial Equipment and Machinery Moving | GBP 150 ~ GBP 350 per Hour | Cost per hour for moving heavy machinery. Includes labor and specialized equipment. Minimum = 2 hours Usually = 2~6 hours |
Machinery Relocation and Transportation | GBP 1,200 ~ GBP 9,000+ | Complexity-based pricing. Includes specialized equipment and skilled labor. Minimum = GBP 400 Usually = 1~2 days |
Industrial/Heavy Rigging and Lifting | GBP 1,200 ~ GBP 9,000+ | Pricing varies by the scope and complexity. Includes skilled labor and machinery. Minimum = GBP 400 Usually = 1~3 days |
Heavy Erecting Services | GBP 1,600 ~ GBP 11,000+ | Pricing is based on the project’s complexity. Includes skilled labor and machinery. Minimum = GBP 400 Usually = 2~4 days |
Lab and Medical Equipment Moving | GBP 1,200 ~ GBP 6,500+ | Includes specialized packing and transport. Minimum = GBP 400 Usually = 1 day |
CNC Machine Moving Services | GBP 1,600 ~ GBP 9,000+ | Pricing varies based on the type and size of the CNC machine and distance. Minimum = GBP 400 Usually = 1~3 days |
Printing Equipment Moving Services | GBP 1,200 ~ GBP 7,500+ | Includes disassembly, moving, and reassembly. Minimum = GBP 400 Usually = 1~2 days |
Electrical Transformers Moving | GBP 1,600 ~ GBP 9,000+ | Varies based on transformer size and complexity. Minimum = GBP 400 Usually = 1~3 days |
IT/Data Centers Moving Services | GBP 4,000 ~ GBP 28,000+ | Includes shutdown, transport, and setup. Minimum = GBP 800 Usually = 1~4 weeks |
Factory/Plant Relocation Services | GBP 40,000 ~ GBP 190,000+ | Comprehensive planning, labor, and logistics. Minimum = GBP 1,600 Usually = 1~2 weeks |
Industrial Millwright and Installation | GBP 150 ~ GBP 280 per Hour | Hourly rate for installation/maintenance. Minimum = 2 hours Usually = 2~8 hours |
Industrial Storage and Warehousing | GBP 0.40 ~ GBP 2.20 per Sq Ft / Month | Monthly storage fee. Minimum = 50-100 sq ft for 1-3 months storing commitment |
Crating and Packing Services | Starting at GBP 40 per Crate | Varies by crate size and material. Minimum = 2 crates Usually = 1 day |
Forklift Moving Service | GBP 80 ~ GBP 180 per Hour | Includes operator and fuel. Minimum = 2 hours Usually = 2~5 hours |
Crane Rental with Operator | GBP 150 ~ GBP 350 per Hour | Includes crane and operator. Minimum = 3 hours Usually = 4~10 hours |
Project Management and Consultation | GBP 80 ~ GBP 180 per Hour | Consulting on industrial moving projects. Minimum = 2 hours Usually = 2~8 hours |
Logistics Services | Approx 5~15% of Total Project Cost | Separate from other service quotes. Ensures smooth operation. |
Clean Room Moving Services | GBP 1,600 ~ GBP 11,000+ | Specialized service for clean rooms. Minimum = GBP 400 Usually = 1~3 days |
High-Value Equipment Insurance | Customized Pricing | Custom pricing based on market value and risks. |
Emergency Response Services | GBP 240 ~ GBP 550 per Hour | Includes after-hours availability. Minimum = GBP 800 Usually = 1~4 hours |
Decommissioning Services | GBP 1,200 ~ GBP 9,000+ | Includes safe disassembly and removal. Minimum = GBP 400 Usually = 1~2 days |
Overseas Shipping Services | GBP 4,000 ~ GBP 48,000+ | Includes international shipping and logistics. Minimum = GBP 800 Usually = 1~2 weeks |
Transport Route Planning | GBP 400 ~ GBP 1,800 per Project | One-time fee for efficient route planning. Minimum = GBP 400 Usually = 1~3 days |
Preventative Maintenance and Inspection | GBP 120 ~ GBP 360 per Hour | Hourly rate for preventive maintenance. Minimum = 2 hours Usually = 2~6 hours |
Waste Management and Recycling | GBP 400 ~ GBP 1,800 per Project | Includes disposal and/or recycling of industrial waste. Minimum = GBP 400 Usually = 1~2 days |
Price Ranges in Australia 🇦🇺
Type of Service | Price Range | Details |
---|---|---|
Heavy Industrial/Commercial Equipment and Machinery Moving | AUD 250 ~ AUD 500 per Hour | Cost per hour of moving heavy machinery and equipment. Includes labor and specialized moving equipment. Minimum = 2 hours Usually = 2~6 hours |
Machinery Relocation and Transportation | AUD 1,900 ~ AUD 12,500+ | Pricing depends on the complexity of the relocation. Includes specialized equipment and skilled labor. Minimum = AUD 600 Usually = 1~2 days |
Industrial/Heavy Rigging and Lifting | AUD 1,900 ~ AUD 12,500+ | Cost is dependent on the scope and complexity of the job. Includes skilled labor and machinery. Minimum = AUD 600 Usually = 1~3 days |
Heavy Erecting Services | AUD 2,500 ~ AUD 15,000+ | Cost is based on the scope and complexity of the erecting project. Includes skilled labor and machinery. Minimum = AUD 600 Usually = 2~4 days |
Lab and Medical Equipment Moving | AUD 1,900 ~ AUD 8,750+ | Includes sensitive handling, specialized packing, and transport. Minimum = AUD 600 Usually = 1 day |
CNC Machine Moving Services | AUD 2,500 ~ AUD 12,500+ | Cost is based on the type and size of the CNC machine and distance. Minimum = AUD 600 Usually = 1~3 days |
Printing Equipment Moving Services | AUD 1,900 ~ AUD 10,000+ | Includes disassembly, moving, and reassembly of printing equipment. Minimum = AUD 600 Usually = 1~2 days |
Electrical Transformers Moving | AUD 2,500 ~ AUD 12,500+ | Cost is based on the size and complexity of the transformer, as well as distance. Minimum = AUD 600 Usually = 1~3 days |
IT/Data Centers Moving Services | AUD 6,250 ~ AUD 37,500+ | Includes safe shutdown, transport, and setup of IT equipment. Price can vary based on volume and complexity. Minimum = AUD 1,250 Usually = 1~4 days |
Factory/Plant Relocation Services | AUD 62,500 ~ AUD 250,000+ | Comprehensive service for relocating factories and plants. Includes planning, labor, and logistics. Minimum = AUD 2,500 Usually = 1~2 weeks |
Industrial Millwright and Installation | AUD 250 ~ AUD 375 per Hour | Cost per hour for installing or maintaining industrial machinery. Includes skilled millwright labor. Minimum = 2 hours Usually = 2~8 hours |
Industrial Storage and Warehousing | AUD 0.60 ~ AUD 3.10+ per Sq Ft / Month | Monthly fee per square foot for storage of industrial equipment and machinery. Minimum = 60-120 sq ft for 1-3 months storing commitment |
Crating and Packing Services | Starting at AUD 60 per Crate | Cost per crate for packing services. Size and material can affect the price. Minimum = 2 crates Usually = 1 day |
Forklift Moving Service | AUD 125 ~ AUD 250 per Hour | The price per hour for forklift operation includes operator and fuel. Minimum = 2 hours Usually = 2~5 hours |
Crane Rental with Operator | AUD 250 ~ AUD 500 per Hour | The cost per hour includes both the crane rental and the skilled operator. Rates can vary depending on the type of crane required and the project’s complexity. Minimum = 4 hours Usually = 4~10 hours |
Project Management and Consultation | AUD 125 ~ AUD 250 per Hour | Price per hour for overseeing and consulting on industrial moving projects. Minimum = 2 hours Usually = 2~8 hours |
Logistics Services | Approximately 5~15% of Total Project Cost | Logistics services cover everything from planning and coordination to monitoring and executing the move. This fee is in addition to the costs of other services and ensures a smooth, hassle-free experience. Separate charge, not included in other service quotes! |
Clean Room Moving Services | AUD 2,500 ~ AUD 15,000+ | Specialized service for moving equipment in and out of clean rooms. Includes necessary precautions and labor. Minimum = AUD 600 Usually = 1~3 days |
High-Value Equipment Insurance | Customized Pricing | The cost of insuring your high-value equipment is customized based on its market value, transportation risks, and the nature of your project. |
Emergency Response Services | AUD 375 ~ AUD 750 per Hour | Premium rates for emergency response services include after-hours availability and rapid deployment of specialized labor and machinery. Minimum = AUD 1,250 Usually = 1~4 hours |
Decommissioning Services | AUD 1,900 ~ AUD 12,500+ | Includes safe disassembly and removal of industrial machinery and equipment. Minimum = AUD 600 Usually = 1~2 days |
Overseas Shipping Services | AUD 6,250 ~ AUD 62,500+ | Includes international shipping, customs clearance, and logistics. Minimum = AUD 1,250 Usually = 1~2 weeks |
Transport Route Planning | AUD 625 ~ AUD 2,500 per Project | One-time fee for planning the most efficient and safe transport routes. Minimum = AUD 600 Usually = 1~3 days |
Preventative Maintenance and Inspection | AUD 190 ~ AUD 500 per Hour | Cost per hour for preventive checks and maintenance of industrial machinery. Minimum = 2 hours Usually = 2~6 hours |
Waste Management and Recycling | AUD 625 ~ AUD 2,500 per Project | Includes disposal and/or recycling of industrial waste. Minimum = AUD 600 Usually = 1~2 days |
Price Ranges in New Zealand 🇳🇿
Type of Service | Price Range | Details |
---|---|---|
Heavy Equipment and Machinery Moving | NZD 300 – NZD 600 per Hour | Cost per hour of moving heavy machinery and equipment. Minimum = 2 hours Usually = 2~6 hours |
Machinery Relocation and Transportation | NZD 2,000 – NZD 14,000+ | Pricing depends on the complexity of the relocation. Minimum = NZD 700 Usually = 1~2 days |
Industrial/Heavy Rigging and Lifting | NZD 2,000 – NZD 14,000+ | Cost is dependent on the scope and complexity. Minimum = NZD 700 Usually = 1~3 days |
Heavy Erecting Services | NZD 2,800 – NZD 17,000+ | Cost is based on the scope and complexity. Minimum = NZD 700 Usually = 2~4 days |
Lab and Medical Equipment Moving | NZD 2,100 – NZD 9,800+ | Includes sensitive handling and transport. Minimum = NZD 700 Usually = 1 day |
CNC Machine Moving Services | NZD 2,800 – NZD 14,000+ | Cost is based on the type and size of the machine. Minimum = NZD 700 Usually = 1~3 days |
Printing Equipment Moving Services | NZD 2,100 – NZD 11,000+ | Includes disassembly and reassembly. Minimum = NZD 700 Usually = 1~2 days |
Electrical Transformers Moving | NZD 2,800 – NZD 14,000+ | Cost is based on size and complexity. Minimum = NZD 700 Usually = 1~3 days |
IT/Data Centers Moving Services | NZD 7,000 – NZD 42,000+ | Includes safe shutdown and setup. Minimum = NZD 1,400 Usually = 1~4 days |
Factory/Plant Relocation Services | NZD 70,000 – NZD 280,000+ | Comprehensive service. Minimum = NZD 3,000 Usually = 1~2 weeks |
Industrial Millwright and Installation | NZD 280 – NZD 420 per Hour | Cost per hour for installing or maintaining. Minimum = 2 hours Usually = 2~8 hours |
Industrial Storage and Warehousing | NZD 0.70 – NZD 3.50+ per Sq Ft / Month | Monthly fee per square foot. Minimum = 70-140 sq ft for 1-3 months storing commitment |
Crating and Packing Services | Starting at NZD 70 per Crate | Cost per crate. Minimum = 2 crates Usually = 1 day |
Forklift Moving Service | NZD 140 – NZD 280 per Hour | Price per hour includes operator and fuel. Minimum = 2 hours Usually = 2~5 hours |
Crane Rental with Operator | NZD 300 – NZD 600 per Hour | Includes both crane rental and the operator. Minimum = 4 hours Usually = 4~10 hours |
Project Management and Consultation | NZD 140 – NZD 280 per Hour | Price per hour for overseeing. Minimum = 2 hours Usually = 2~8 hours |
Logistics Services | Approximately 5~15% of Total Project Cost | Separate charge, not included in other service quotes! |
Clean Room Moving Services | NZD 2,800 – NZD 17,000+ | Specialized service. Minimum = NZD 700 Usually = 1~3 days |
High-Value Equipment Insurance | Customized Pricing | Customized based on market value and risks |
Emergency Response Services | NZD 420 – NZD 840 per Hour | Premium rates for emergency services. Minimum = NZD 1,400 Usually = 1~4 hours |
Decommissioning Services | NZD 2,100 – NZD 14,000+ | Includes safe disassembly. Minimum = NZD 700 Usually = 1~2 days |
Overseas Shipping Services | NZD 7,000 – NZD 70,000+ | Includes international shipping. Minimum = NZD 1,400 Usually = 1~2 weeks |
Transport Route Planning | NZD 700 – NZD 2,800 per Project | One-time fee for planning. Minimum = NZD 700 Usually = 1~3 days |
Preventative Maintenance and Inspection | NZD 210 – NZD 560 per Hour | Cost per hour for checks and maintenance. Minimum = 2 hours Usually = 2~6 hours |
Waste Management and Recycling | NZD 700 – NZD 2,800 per Project | Includes disposal and recycling. Minimum = NZD 700 Usually = 1~2 days |
Price Ranges in Ireland 🇮🇪
Type of Service | Price Range | Details |
---|---|---|
Heavy Equipment and Machinery Moving | EUR 200 – EUR 450 per Hour | Cost per hour of moving heavy machinery. Minimum = 2 hours Usually = 2~6 hours |
Machinery Relocation and Transportation | EUR 1,800 – EUR 11,000+ | Complexity-based pricing. Minimum = EUR 550 Usually = 1~2 days |
Industrial/Heavy Rigging and Lifting | EUR 1,800 – EUR 11,000+ | Cost is dependent on scope and complexity. Minimum = EUR 550 Usually = 1~3 days |
Heavy Erecting Services | EUR 2,300 – EUR 13,000+ | Cost is based on size and complexity. Minimum = EUR 550 Usually = 2~4 days |
Lab and Medical Equipment Moving | EUR 1,700 – EUR 7,800+ | Sensitive handling and specialized transport. Minimum = EUR 550 Usually = 1 day |
CNC Machine Moving Services | EUR 2,300 – EUR 11,000+ | The cost is based on type and size. Minimum = EUR 550 Usually = 1~3 days |
Printing Equipment Moving Services | EUR 1,800 – EUR 9,000+ | Includes disassembly and reassembly. Minimum = EUR 550 Usually = 1~2 days |
Electrical Transformers Moving | EUR 2,300 – EUR 11,000+ | Cost is based on size and complexity. Minimum = EUR 550 Usually = 1~3 days |
IT/Data Centers Moving Services | EUR 5,500 – EUR 33,000+ | Safe shutdown and setup included. Minimum = EUR 1,100 Usually = 1~4 days |
Factory/Plant Relocation Services | EUR 55,000 – EUR 220,000+ | Comprehensive service. Minimum = EUR 2,200 Usually = 1~2 weeks |
Industrial Millwright and Installation | EUR 225 – EUR 335 per Hour | Per-hour cost for installation. Minimum = 2 hours Usually = 2~8 hours |
Industrial Storage and Warehousing | EUR 0.55 – EUR 2.80 per Sq Ft / Month | Monthly fee per sq ft. Minimum = 50-100 sq ft for 1-3 months storing commitment |
Crating and Packing Services | Starting at EUR 55 per Crate | Cost per crate. Minimum = 2 crates Usually = 1 day |
Forklift Moving Service | EUR 115 – EUR 225 per Hour | Includes operator and fuel. Minimum = 2 hours Usually = 2~5 hours |
Crane Rental with Operator | EUR 200 – EUR 450 per Hour | Includes crane and operator. Minimum = 4 hours Usually = 4~10 hours |
Project Management and Consultation | EUR 115 – EUR 225 per Hour | Per-hour fee for project management. Minimum = 2 hours Usually = 2~8 hours |
Logistics Services | Approximately 5~15% of Total Project Cost | Separate charge, not included in other quotes! |
Clean Room Moving Services | EUR 2,300 – EUR 13,000+ | Specialized service. Minimum = EUR 550 Usually = 1~3 days |
High-Value Equipment Insurance | Customized Pricing | Based on market value and risks |
Emergency Response Services | EUR 340 – EUR 675 per Hour | Premium for emergency services. Minimum = EUR 1,100 Usually = 1~4 hours |
Decommissioning Services | EUR 1,800 – EUR 11,000+ | Includes disassembly. Minimum = EUR 550 Usually = 1~2 days |
Overseas Shipping Services | EUR 5,500 – EUR 55,000+ | Includes international shipping. Minimum = EUR 1,100 Usually = 1~2 weeks |
Transport Route Planning | EUR 575 – EUR 2,300 per Project | One-time planning fee. Minimum = EUR 550 Usually = 1~3 days |
Preventative Maintenance and Inspection | EUR 175 – EUR 450 per Hour | For preventive checks and maintenance. Minimum = 2 hours Usually = 2~6 hours |
Waste Management and Recycling | EUR 575 – EUR 2,300 per Project | Includes disposal and recycling. Minimum = EUR 550 Usually = 1~2 days |
Price Ranges in Singapore 🇸🇬
Type of Service | Price Range | Details |
---|---|---|
Heavy Equipment and Machinery Moving | SGD 280 – SGD 550 per Hour | Cost per hour of moving heavy machinery. Minimum = 2 hours Usually = 2~6 hours |
Machinery Relocation and Transportation | SGD 2,100 – SGD 14,000+ | Complexity-based pricing. Minimum = SGD 650 Usually = 1~2 days |
Industrial/Heavy Rigging and Lifting | SGD 2,100 – SGD 14,000+ | The cost is dependent on scope and complexity. Minimum = SGD 650 Usually = 1~3 days |
Heavy Erecting Services | SGD 2,800 – SGD 16,800+ | Based on scope and complexity. Minimum = SGD 650 Usually = 2~4 days |
Lab and Medical Equipment Moving | SGD 2,100 – SGD 9,800+ | Sensitive handling and specialized transport. Minimum = SGD 650 Usually = 1 day |
CNC Machine Moving Services | SGD 2,800 – SGD 14,000+ | The cost is based on type and size. Minimum = SGD 650 Usually = 1~3 days |
Printing Equipment Moving Services | SGD 2,100 – SGD 11,200+ | Includes disassembly and reassembly. Minimum = SGD 650 Usually = 1~2 days |
Electrical Transformers Moving | SGD 2,800 – SGD 14,000+ | Cost is based on size and complexity. Minimum = SGD 650 Usually = 1~3 days |
IT/Data Centers Moving Services | SGD 7,000 – SGD 42,000+ | Safe shutdown and setup included. Minimum = SGD 1,400 Usually = 1~4 days |
Factory/Plant Relocation Services | SGD 70,000 – SGD 280,000+ | Comprehensive service. Minimum = SGD 2,800 Usually = 1~2 weeks |
Industrial Millwright and Installation | SGD 280 – SGD 420 per Hour | Per-hour cost for installation. Minimum = 2 hours Usually = 2~8 hours |
Industrial Storage and Warehousing | SGD 0.65 – SGD 3.50 per Sq Ft / Month | Monthly fee per sq ft. Minimum = 70-140 sq ft for 1-3 months storing commitment |
Crating and Packing Services | Starting at SGD 70 per Crate | Cost per crate. Minimum = 2 crates Usually = 1 day |
Forklift Moving Service | SGD 140 – SGD 280 per Hour | Includes operator and fuel. Minimum = 2 hours Usually = 2~5 hours |
Crane Rental with Operator | SGD 280 – SGD 550 per Hour | Includes crane and operator. Minimum = 4 hours Usually = 4~10 hours |
Project Management and Consultation | SGD 140 – SGD 280 per Hour | Per-hour fee for project management. Minimum = 2 hours Usually = 2~8 hours |
Logistics Services | Approximately 5~15% of Total Project Cost | Separate charge, not included in other quotes! |
Clean Room Moving Services | SGD 2,800 – SGD 16,800+ | Specialized service. Minimum = SGD 650 Usually = 1~3 days |
High-Value Equipment Insurance | Customized Pricing | Based on market value and risks |
Emergency Response Services | SGD 420 – SGD 840 per Hour | Cost is based on size and complexity. Minimum = SGD 650 Usually = 1~4 hours |
Decommissioning Services | SGD 2,100 – SGD 14,000+ | Includes disassembly. Minimum = SGD 650 Usually = 1~2 days |
Overseas Shipping Services | SGD 7,000 – SGD 70,000+ | Includes international shipping. Minimum = SGD 1,400 Usually = 1~2 weeks |
Transport Route Planning | SGD 700 – SGD 2,800 per Project | One-time planning fee. Minimum = SGD 650 Usually = 1~3 days |
Preventative Maintenance and Inspection | SGD 210 – SGD 560 per Hour | For preventive checks and maintenance. Minimum = 2 hours Usually = 2~6 hours |
Waste Management and Recycling | SGD 700 – SGD 2,800 per Project | Includes disposal and recycling. Minimum = SGD 650 Usually = 1~2 days |
Price Ranges in Ukraine 🇺🇦

Use the related >> Online Calculator << specifically for the Ukrainian market.
FAQs (TOP-5)
The cost of moving industrial equipment varies depending on many factors, including the size and weight of the equipment/machine, the distance being moved, and the complexity of the move. However, as a general guide, you can expect to pay between $250 and $500 per hour for moving heavy industrial/commercial equipment and machinery.
There are a variety of industrial moving services available, including:
– Machinery relocation and transportation
– Industrial/heavy rigging and lifting
– Heavy erecting services
– Lab and Medical equipment moving
– CNC machine moving services
– Printing equipment moving services
– Electrical transformers moving
– IT/data centers moving services
– Factory/Plant/Facility relocation services
– Industrial millwright and installation
– Industrial storage and warehousing
– Crating and packing services
– Forklift moving services
– Crane rental with operator
– Project management and consultation
– Logistics services
– Clean room moving services
– High-value equipment insurance
– Emergency response services
– Decommissioning services
– Overseas shipping services
– Transport route planning
– Preventive maintenance and inspection
– Waste management and recycling
– etc…
The following factors can affect the cost of industrial moving services:
– Size, Weight, and the Complexity of the equipment/machinery
– Distance being moved
– Complexity of the move/route
– Type of equipment/machine being moved
– Time of year
– Availability of moving companies
– Level of experience and reputation of the moving company
– etc…
There are a few things you can do to save money on industrial moving services, such as:
– Get multiple quotes from different moving companies
– Schedule your move during the off-season
– Be prepared to do some of the packing and unpacking yourself
– Ask about discounts for seniors, veterans, or members of professional organizations
When choosing an industrial moving company, it is essential to consider the following factors:
– Company’s experience and reputation
– Company’s licensing and insurance
– Company’s range of services
– Company’s pricing
– Company’s customer service